India: Marine Construction, Gujarat
U/w Clamp Fixing
Our Work
The marine construction team was contracted for underwater fixing of Cathode Anode pile protection Clamp at main load out jetty.
Result
The work was well executed and to the Client's satisfaction.
Facts & figures
India: Marine Construction, Gujarat
U/w Cutting
Our Work
The marine construction team was contracted to carry-out underwater cutting of sheet piles.
Result
Total L Mtrs. of cutting was approx. 300 L Mtrs. The work was completed in different phases as per client's requirements. The work was completed to the Client's satisfaction.
Facts & figures
India: Marine Construction, Gujarat
Crane Grab Recovery & Well Sinking
Our Work
The marine construction team was contracted to recover the de-silting crane's grab from the well and report the underwater obstruction not allowing them to sink the well.
Result
The crane's grab was recovered within 4 hrs. The sinking well shoe was checked and underwater repairs were carried out to the damage. After final report from divers, de-silting & well sinking was resumed by the client. There were no further delays reported.
Facts & figures
India: Marine Construction, Gujarat
U/w Gabions Placement
Our Work
The marine construction team was contracted to carry-out underwater gabions placement work.
Result
The work was completed as per schedule and to the satisfaction of the Client.
Facts & figures
India: Marine Construction, Orissa
U/w Pipeline laying across the channel (with IRS Classification Surveyor)
Our Work
The client made 2 unsuccessful attempts before contracting Sealord.
The marine construction team was mobilized on site. The team inspected the site and approved the same. The fabrication team started welding the pipes one by one. Once the entire length of 345 mtr. was welded onshore, the pipeline was ready for launch. The IRS Surveyors carried out NDT Tests on each joint & weld and gave satisfactory approval. The pipeline was pulled with tugboats towards seaside and laid across the navigational channel of Paradip Port without much disturbance to the in & out port traffic.
Result
The testing & commissioning of 900 MM DIA Steel Pipe was successfully completed by Sealord in the presence of IRS Surveyors with Client's representatives on site. Work Completion Certificate & NOC were issued to Sealord by the Client.
Facts & figures
Oman: Marine Construction, Muscat
U/w Construction of Dry Dock
Our Work
The company was sub-contracted for underwater construction of Dry Dock (Slipway). The company was sub-contracted to provide all types of underwater services with machinery, equipment & personnel.
Result
The sub-contract was successfully completed by Sealord.
Facts & figures